Citrus Heights |
Code of Ordinances |
Chapter 66. PLANNING |
Article VI. CHAPTER 16.87 ROADWAY AND TRANSIT DEVELOPMENT FEES |
§ 66-178. Calculation of roadway fee obligation.
The roadway fee shall be calculated pursuant to the following formula:
(A U × [R P - R C ]) + (A F × [R P - R C ]) + S = R F
where,
A U = additional dwelling units (for residential land use types); A F = additional floor area of buildings (for non-residential land use types); R P = roadway program fee per additional dwelling unit (for residential land use types) or additional floor area of buildings (for non-residential land use types); R C = roadway program credit per additional dwelling unit (for residential land use types) or additional floor area of buildings (for non-residential land use types) for construction in the Bradshaw Road/U.S. 50 Corridor Integrated Financing District in Fee District 2, the Sunrise Boulevard/U.S. 50 Corridor Assessment District in Fee District 3 and/or in the Capital Center II Assessment District in Fee District 3; S = 2 percent of (A U × [R P - R C ]) + (A F × [R P - R C ]), which is the fee for the Department's administrative cost recovery for this part of the program; and R F = the total roadway fee obligation which shall be paid by the property owner.
(Ord. No. 97-01, § 2(16.87.070), 1-2-1997; Ord. No. 97-13, § 2, 3-26-1997; Ord. No. 97-17, § 2, 9-24-1997)